Case Studies

Examples of recent commercial dilapidations works, strip outs and reinstatements.

4,500 sq ft Open-Plan Office, City of London

Completed in 8 working days

Scope of Works:

  • Demounting and removal of 30 linear metres of glazed partitioning
  • Strip out of tenant data cabling and server room infrastructure
  • Making good to suspended ceiling grid and replacing damaged tiles
  • Full internal redecoration to Cat A standard

Outcome: Works completed for around 35% below the landlord's quantified demand (illustrative example). The tenant handed the keys back on the lease expiry date with zero ongoing liability.

12,000 sq ft Industrial Warehouse, Leeds

Completed in 15 working days

Scope of Works:

  • Dismantling and removal of a 2,500 sq ft structural steel mezzanine
  • Epoxy resin repair to floor slab bolt holes and impact damage
  • Cut-edge corrosion treatment to external cladding
  • Servicing and repair of 3 roller shutter doors

Outcome: Works completed for around 40% below the landlord's quantified demand (illustrative example). The landlord accepted the photographic sign-off pack without issue.

2,000 sq ft High Street Retail Unit, Manchester

Completed in 6 working days

Scope of Works:

  • Complete strip out of bespoke shop fittings and slat walls
  • Removal of tenant-installed illuminated shop front signage
  • Uplift and disposal of ceramic floor tiling
  • Making good to shell and core blockwork

Outcome: Works completed on schedule despite strict out-of-hours working restrictions imposed by the local authority.